Tuesday, April 14, 2026

Some Assembly Required


 

5 comments:

  1. I know someone that bought a modular (built in a factory) home that was shipped to the site in 2 halves. The conventional gable dormers were installed after the fact.

    ReplyDelete
  2. This window leaked for years.....now being pulled off. - Snakepit

    ReplyDelete
  3. Hope they've got good flashing.

    ReplyDelete
  4. Pretty common method for upgrading the "Dachwohnung" (Attic room) here in Germany.

    ReplyDelete
  5. I'm imagining the cost of the crane rental.

    ReplyDelete